Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/586
Title: | Evaluación técnico-financiera del completamiento dual para un pozo tipo del bloque Cubiro |
Authors: | Cabana Grajales, Laura Cristina Zuluaga Llano, Juan Camilo |
Thesis advisor: | Plata Martínez, Adrián Enrique |
License type: | Atribución – No comercial |
Keywords: | Análisis nodal;Completamiento dual;Levantamiento artificial;Nodal analysis;Dual completion;Artificial lift;Tesis y disertaciones académicas |
Issue Date: | 19-Aug-2016 |
Publisher: | Fundación Universidad de América |
Resumen: | En este trabajo se evalúa el diseño de un completamiento dual que permite producir dos formaciones simultáneamente sin que estas se mezclen, en un pozo tipo del Bloque Cubiro que tiene tubería de revestimiento en fondo de 9 5/8. Los completamientos duales manejan dos tuberías de producción que pueden estar colocadas en distintas configuraciones, ya sea en paralelo o concéntricamente, para maneja las formaciones de manera independiente, determinando que la apropiada para el pozo es la del completamiento concéntrico debido a las restricciones de espacio. Por medio de una matriz de selección que evalúa cualitativa y cuantitativamente los sistemas de levantamiento artificiales convencionales con las características presentes en el pozo del Bloque Cubiro, se determina que el levantamiento más óptimo es el de Bombeo Electrosumergible (BES). |
Abstract: | This work evaluates the design of a dual completion that allows the production of two reservoirs simultaneously without mixing, in a well type on "Bloque Cubiro" which have a bottom casing of 9 5/8. The dual completions manage two production tubing can be arranged in differents configurations, either in parallel or concentrically to handle formations independently determining that proper for the well is the concentric completion due to space restrictions. Through a selection matrix that evaluates qualitatively and quantitatively conventional artificial lift systems with the features present in the well of Block Cubiro, it is determined that the optimum lifting is Electrosubmersible pumping (ESP). |
URI: | http://hdl.handle.net/20.500.11839/586 |
Citation: | APA 6th - Cabana Grajales, L. C. y Zuluaga Llano, J. C. (2016) Evaluación técnico-financiera del completamiento dual para un pozo tipo del bloque Cubiro (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/586 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5111695-2016-2-IP.pdf | 4.53 MB | Adobe PDF | View/Open |