Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6457
Title: | Selección de mejores prácticas preventivas para disminuir los tiempos no productivos debido a pega de tubería por empaquetamiento para la perforación en el Campo Castilla de Ecopetrol S.A. |
Authors: | Medrano Guerrero, Alice Daniela Perez Gutierrez, Andrés Felipe |
Thesis advisor: | Espinosa Mora, Carlos Alberto |
License type: | Atribución – No comercial – Sin Derivar |
Keywords: | Campo Castilla;Empaquetamiento;Mejores prácticas preventivas;Castilla Field;Packing;Best preventive practices;Tesis y disertaciones académicas |
Issue Date: | 22-Aug-2017 |
Publisher: | Fundación Universidad de América |
Resumen: | En este proyecto se selecciona mejores prácticas para la perforación de nuevos pozos en el Campo Castilla, ya que basado con la experiencia de Ecopetrol S.A. en la operación del campo, la pega de tubería por empaquetamiento es uno de los problemas operacionales con mayor porcentaje de ocurrencia. De acuerdo con lo anterior, el proyecto se desarrolla en 5 etapas. En la primera etapa, se realiza el capítulo geológico del Campo Castilla, con el fin de entrar en contexto acerca de la ubicación espacial y temporal de este. Igualmente, se define sus características geológicas. En la segunda etapa, se realiza la revisión de las bases teóricas. En donde, se definen los tipos de pega de tubería y se enfatiza en la pega mecánica, puntualmente en el empaquetamiento. En esta etapa se describe cada causa que conlleva al empaquetamiento, estableciendo la razón por la cual se presenta, sus señales de advertencia y la prevención según la academia. |
Abstract: | In this project, the best practices are choosed to drilling new wells in the Castilla Field, based on Ecopetrol's experience in the operation of field, the stuck pipe by packing is one of the operationals problems with a high percentage event. With that being said, the project is developed in five stages. In the first stage, the Castilian field geologycal chapter is done, with the aim to get in context about the spatial and temporal position about this. Equally, its geologycal features are defined. In the second stage, the theoretical bases are reviewed. In which the types of stuck pipes are defined and the mechanical stuck is emphasized, punctually in the packing. This stage describes each cause that leads to packing, establishing the reason why it is presented, its warning signs and prevention according to the academy. |
URI: | http://hdl.handle.net/20.500.11839/6457 |
Citation: | APA 6th - Medrano Guerrero, A. D. y Perez Gutierrez, A. F. (2017) Selección de mejores prácticas preventivas para disminuir los tiempos no productivos debido a pega de tubería por empaquetamiento para la perforación en el Campo Castilla de Ecopetrol S.A. (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6457 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5131581-2017-2-IP.pdf | 8.23 MB | Adobe PDF | View/Open |