Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6750
Title: | Reestructuración técnica en la línea de ensamble montaje ‘A’ de la compañía Marcopolo S.A. |
Other Titles: | Technical restructuring in the assembly line 'A' of the company Marcopolo S.A. |
Authors: | Riaño Casagua, Laura Camila |
Thesis advisor: | Enciso Jaramillo, Jorge Humberto |
License type: | Atribución – No comercial |
Keywords: | Reestructuración;Buses;Productividad;Restructuring;Productivity;Tesis y disertaciones académicas |
Issue Date: | 17-May-2018 |
Publisher: | Fundación Universidad de América |
Resumen: | En el proyecto presentado a continuación, se desarrolló una empresa dedicada a la fabricación de carrocerías de buses grandes y pequeños; para fines de este trabajo, se tomó como referencia la línea de buses grandes Paradiso 1200 G7, con el objetivo de definir las distintas problemáticas que se presentan en el área tales como el retraso en la disposición de materiales para ensamblar al bus, falta de sincronización con los talleres de subensamble, cambio en las órdenes de producción, falta de estandarización en los tiempos de proceso y falta de documentación en los métodos de trabajo que actualmente se ejecutan; teniendo en cuenta dicho panorama. |
Abstract: | In the project presented below a company dedicated to the manufacture of large and small buses; For the purpose of this work, the large bus line Paradiso 1200 G7 was taken as a reference, with the aim of defining the different problems that arise in the area such as the delay in the arrangement of materials to assemble the bus, lack of synchronization with sub-assembly workshops, change in production orders, lack of standardization in process times and lack of documentation in the work methods that are currently being executed; taking into account this panorama. |
URI: | http://hdl.handle.net/20.500.11839/6750 |
Citation: | APA 6th - Riaño Casagua, L. C. (2018) Reestructuración técnica en la línea de ensamble montaje ‘A’ de la compañía Marcopolo S.A. (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6750 |
Appears in Collections: | Trabajos de grado - Ingeniería Industrial |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
3131815-2018-1-II.pdf | 2.46 MB | Adobe PDF | View/Open |