Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/807
Title: | Implementación del rediseño de la ingeniería para las operaciones de perforación en el bloque 54 de la cuenca de oriente del Ecuador |
Authors: | Moreno Tello, Juan Germán |
Thesis advisor: | Fajardo Lozano, Javier Augusto |
License type: | Atribución – No comercial – Sin Derivar |
Keywords: | Cementación;Fluidos;Perforación;Cementation;Fluids;Drilling;Tesis y disertaciones académicas |
Issue Date: | 3-Aug-2016 |
Publisher: | Fundación Universidad de América |
Resumen: | En la siguiente investigación, se presenta el rediseño de la ingeniería para las operaciones de perforación en el Bloque 54, ubicado en la Cuenca de Oriente del Ecuador para su posterior implementación en campo y de esta manera comparar si hubo una reducción en los tiempos totales de la perforación con respecto a la campaña 2013-2014, realizada en el mismo bloque. El rediseño se hizo en cuanto a las brocas, fluidos de perforación, sistema de control de sólidos, tubería de revestimiento, cementación, perforación direccional y colgadores, basándose en experiencias anteriores y problemas operacionales ocurridos en la campaña 2013-2014. |
Abstract: | The following investigation presents the redesign of engineering for drilling operations in Block 54, located in the East Basin of Ecuador for subsequent field implementation and thus compare if there was a reduction in total drilling time respect to the 20D-2014 campaign, conducted in the same block. The redesign was based on bits, drilling fluids, solids control system, casing, cementing, directional drilling and hangers, based on past experience and operational problems occurred in the 2013-2014 campaign. |
URI: | http://hdl.handle.net/20.500.11839/807 |
Citation: | APA 6th - Moreno Tello, J. G. (2016) Implementación del rediseño de la ingeniería para las operaciones de perforación en el bloque 54 de la cuenca de oriente del Ecuador (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/807 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5111655-2016-2-IP.pdf | 5.12 MB | Adobe PDF | View/Open |