Title: Análisis de riesgos bajo un modelo de lógica difusa en la construcción del proyecto hidroeléctrico Hidroituango
Other Titles: Risk analysis under a fuzzy logic model in the construction of the hydroelectric project Hidroituango
Authors: López Rojas, Alejandro Duván
Rodríguez López, Diana Johana
Thesis advisor: D'Auria Sánchez, Lucas
License type: Atribución – No comercial
Keywords: Control de riesgos;Lógica difusa;Manejo de riesgos;Proyectos hidroeléctricos;Risk control;Diffuse logic;Risk management;Hydroelectric projects;Tesis y disertaciones académicas
Issue Date: 19-Oct-2021
Publisher: Fundación Universidad de América
Resumen: El propósito del presente documento es analizar y cuantificar los riesgos de un proyecto hidroeléctrico en Colombia, mediante la valoración de las relaciones que se pueden generar entre los distintos tipos de riesgos. Para ello, se emplea como caso de estudio el proyecto HidroItuango que es desarrollado por Empresas Públicas de Medellín (EPM), proyecto que ha presentado una gran variedad de riesgos interrelacionados y para cuyo análisis es necesario una valoración por relación de incertidumbre e impacto. Para el análisis de riesgos se utilizaron evaluaciones de riesgo y juicios de expertos, en lugar de razonamientos probabilísticos, y se propuso una herramienta de calificación difusa, en donde la metodología empleada utiliza un análisis de decisiones multicriterio, el cual permite comprender de forma fácil y flexible el análisis de riesgos del proyecto.
Abstract: The purpose of this document is to analyze and quantify the risks of a hydroelectric project in Colombia, by assessing the relationships that can be generated between the different types of risks. For this, the HidroItuango project is used as a case study, which is developed by Empresas Públicas de Medellín (EPM), a project that has presented a great variety of interrelated risks and for whose analysis an assessment is necessary based on uncertainty and impact. For the risk analysis, risk assessments and expert judgments were used, instead of probabilistic reasoning, and a fuzzy scoring tool was proposed, where the methodology used uses a multi-criteria decision analysis, which allows to understand easily and Flexible project risk analysis.
URI: https://hdl.handle.net/20.500.11839/8755
Citation: APA 7th - López Rojas, A. D. y Rodríguez López, D. J. (2021) Análisis de riesgos bajo un modelo de lógica difusa en la construcción del proyecto hidroeléctrico Hidroituango. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8755
Appears in Collections:Trabajos de grado - Gerencia de Proyectos

Files in This Item:
File Description SizeFormat 
51649-2021-2-GP.pdf1.23 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
325.81 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons