Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/9137
Title: | Finalización submarina de un pozo de reinyección de corte en la cuenca de santos |
Other Titles: | Subsea completion of a cutting’s reinjection well in the santos basin |
Authors: | Enciso Guerrero, Duvan Yesid Rodríguez Granados, Juan Felipe Soriano Camelo, Cristian C. Gomes, Vando J. Guerrero Martin, Camilo Andrés |
License type: | Atribución – No comercial – Compartir igual |
Keywords: | Hueco abierto;Presión de colapso;Presión de ruptura;Open hole;Collapse pressure;Rupture pressure |
Issue Date: | 5-Feb-2022 |
Publisher: | Fundación Universidad de América |
Resumen: | Cuando existe un pozo productor de hidrocarburos, se generan recortes por el trabajo que genera la broca contra la roca, estos recortes se convierten en desechos del proceso y son enviados a diferentes procesos para su disposición. Desde los años 70, la ingeniería de perforación debe cumplir con las normas ambientales para el manejo de residuos. |
Abstract: | When there is a hydrocarbon producing well, cuttings are generated due to the work generated by the drill bit against the rock, these cuttings become waste from the process and are sent to different holders for disposal. Since the '70s, drilling engineering must comply with environmental standards for waste management. |
URI: | https://hdl.handle.net/20.500.11839/9137 |
Citation: | APA 7th - Enciso Guerrero, D. Y. et al. (2022) Finalización submarina de un pozo de reinyección de corte en la cuenca de santos. [Artículo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9137 |
Appears in Collections: | Artículos de Grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5142079-2022-1-IP.pdf | 1.33 MB | Adobe PDF | View/Open | |
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf Access Restricted | 153.14 kB | Adobe PDF | View/Open Request a copy |