Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/9281
Title: | Análisis de la prospectiva del funcionamiento de un dispositivo De control de calidad en el proceso de impresión de etiquetas en Etipress S.A. |
Other Titles: | Prospective analysis of the operation of a quality control device in the label printing process at Etipress S.A. |
Authors: | Sánchez Díaz, Luis Fernando |
metadata.dc.contributor.advisordocenteinvestigador: | Camargo Salinas, Mónica Andrea |
License type: | Atribución – No comercial |
Keywords: | Control de calidad;Rentabilidad;Retorno de inversión;Proceso de impresión;Quality control;Cost effectiveness;Investment return;Printing process;Tesis y disertaciones académicas |
Issue Date: | 3-Aug-2023 |
Publisher: | Fundación Universidad de América |
Resumen: | En el siguiente trabajo se presentará un análisis de la funcionalidad de un dispositivo de control de calidad, durante el proceso de impresión de etiquetas y su retorno de inversión en la empresa Etipress S.A, basándose en los costos de la no calidad correspondientes al material adicional haciendo referencia a la materia prima que se añade de más mientras se imprime el trabajo para entregar completo al cliente, y de reposición lo que significa volver a producir una orden por un rechazo del comprador, incluyendo la entrega de producciones incompletas que no se envían con la cantidad solicitada por falta de calidad, y los tiempos de hora máquina que se podrían ahorrar si se implementa el dispositivo, con estas variables se identifica que la maquina se vuelve más productiva aumentando la velocidad lo que con lleva a un ahorro del 11% de tiempo al imprimir con un mayor grado de calidad, de esta misma forma calculando lo anterior se evidencia que la inversión se recupera a los 28 meses con un margen de error del 20% después de haber trabajado con el dispositivo, pero, al ser una inversión tan grande se debe pedir un préstamo al banco para financiar el proyecto dando como resultado que en algunos meses la empresa deba proporcionar más dinero aparte de lo que se economiza mensualmente. |
Abstract: | In the following work, an analysis of the functionality of a quality control device will be presented, during the printing of labels and its return on investment in the company Etipress S.A, increased in the costs of non-quality corresponding to the additional material referring to to the raw material that is added while the job is being printed to deliver it completely to the client, and replacement, which means reproducing an order due to a rejection by the buyer, including the delivery of incomplete productions that are not sent with the quantity requested due to lack of quality, and the machine hour times that could be saved if the device is implemented, with these variables it is identified that the machine becomes more productive by increasing the speed, which leads to a saving of 11% of time per month. print with a higher degree of quality, in the same way calculating the above it is evident that the investment is recovered after 28 months with a margin of error of 20% after having worked with the device, but, being such a large investment A loan must be requested from the bank to finance the project, resulting in the company having to provide more money in a few months than what is saved monthly. |
URI: | https://hdl.handle.net/20.500.11839/9281 |
Citation: | APA 7th - Sánchez Díaz, L. F. (2023) Análisis de la prospectiva del funcionamiento de un dispositivo De control de calidad en el proceso de impresión de etiquetas en Etipress S.A. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9281 |
metadata.dc.publisher.program: | Producción y calidad |
Appears in Collections: | Trabajos de grado - Ingeniería Industrial |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
3181460-2023-2-II.pdf | 1.5 MB | Adobe PDF | View/Open | |
3181460-2023-2-II-Anexos1.pdf | 585.33 kB | Adobe PDF | View/Open | |
3181460-2023-2-II-Anexos2.pdf | 309.8 kB | Adobe PDF | View/Open | |
AUTORIZACIÓN PARA PUBLICACIÓN.pdf Access Restricted | 1.41 MB | Adobe PDF | View/Open Request a copy |