Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6335
Title: | Re-diseño del equipo de superficie de slickline disminuyendo el Tiempo en la toma de registros ilt por pozo en el campo la Cira – Infantas |
Authors: | Masmela Wilches, Diego Ricardo |
Thesis advisor: | Castro Rojas, Juan Carlos Carbonell, Adrián |
License type: | Atribución – No comercial – Sin Derivar |
Keywords: | Unidad Slickline;Inyectores de pozos;Slickline Unit;Well Injectors;Tesis y disertaciones académicas |
Issue Date: | 18-May-2017 |
Publisher: | Fundación Universidad de América |
Resumen: | En el primer capítulo del proyecto de grado se describe las generalidades geológicas de la cuenca del valle medio del Magdalena, la historia y ubicación geográfica del campo La Cira – Infantas, las formaciones por las cuales atraviesan los pozos del campo y su historial de producción. En los siguientes dos capítulos se explican las características de los sistemas de Slickline convencionales que se estaban utilizando en el campo por parte de la empresa operadora Occidental Andina y la empresa prestadora de servicios AIP S.A.S, y de igual manera se realiza una introducción de la nueva unidad de Slickline planteada en el trabajo de grado como solución a los inconvenientes e incumplimientos en el contrato entre la empresa del estado colombiano Ecopetrol y Occidental Andina. |
Abstract: | On the first chapter of this project you will find the geological general details of Magdalena's basin, history and location of Campo La Cira-infantas, the formations were the wells go through and their production record. The following two chapters explain the characteristics of the conventional Slickline systems that were being used in the field by the operating company Occidental Andina and the service provider company AIP SAS, and an introduction of the new Unit of Slickline raised in the work of degree as solution to the inconveniences and breaches in the contract between the company of the Colombian state Ecopetrol and Occidental Andina. |
URI: | http://hdl.handle.net/20.500.11839/6335 |
Citation: | APA 6th - Masmela Wilches, D. R. (2017) Re-diseño del equipo de superficie de slickline disminuyendo el Tiempo en la toma de registros ilt por pozo en el campo la Cira – Infantas (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6335 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5102515-2017-1-IP.pdf.pdf | 3.81 MB | Adobe PDF | View/Open |