Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6408
Title: | Evaluación técnico-financiera para la viabilidad de las mallas piramidales en las zarandas para el control de sólidos de los campos Castilla y Chichimene perforados con fluido de perforación base agua |
Authors: | Arango Gómez, Camilo José |
Thesis advisor: | Zorrilla Ahumada, Luis E. |
License type: | Atribución – No comercial – Compartir igual |
Keywords: | Control Sólidos;Malla Piramidal;Campo Castilla;Campo Chichimene;Solids Control;Pyramidal mesh;Castilla Field;Chichimene Field;Tesis y disertaciones académicas |
Issue Date: | 9-Aug-2017 |
Publisher: | Fundación Universidad de América |
Resumen: | En el presente trabajo de grado se realiza una evaluación técnica y financiera del uso de mallas piramidales en el equipo primario de control de sólidos para la perforación de una sección del Pozo Castilla N200 del Campo Castilla y una sección del Pozo Chichimene 211 del Campo Chichimene, en los Llanos Orientales. Para ello, se estudiaron las generalidades geológicas de los campos, tales como historia, localización, estratigrafía, geología del petróleo e historia de producción, y las características principales del control de sólidos durante la perforación, el equipo primario y las mallas utilizadas. |
Abstract: | In this work, a technical and financial evaluation of the use of pyramidal meshes in the primary solids control equipment is carried out for the drilling of a section of the Castilla N200 Well of the Castilla Field and a section of the Chichimene Well 211 of the Chichimene Field, In the Llanos Orientales. To do this, we study the geological generalities of the fields, stories such as history, location, stratigraphy, oil geology and production history, and the main characteristics of solid control during drilling, primary equipment and meshes use. |
URI: | http://hdl.handle.net/20.500.11839/6408 |
Citation: | APA 6th - Arango Gómez, C. J. (2017) Evaluación técnico-financiera para la viabilidad de las mallas piramidales en las zarandas para el control de sólidos de los campos Castilla y Chichimene perforados con fluido de perforación base agua (Trabajo de grado). Fundación Universidad de América. Retrieved from tp://hdl.handle.net/20.500.11839/6408 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5101433-2017-2-IP.pdf | 2.46 MB | Adobe PDF | View/Open |