Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6453
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | Marcuzzi, Ubaldo | - |
dc.contributor.advisor | Rengifo Medina, Juan David | - |
dc.contributor.author | Becerra Buitrago, Andrés | - |
dc.contributor.author | Umbarila Moncaleano, Katalina María | - |
dc.date.accessioned | 2018-04-27T21:19:31Z | - |
dc.date.available | 2018-04-27T21:19:31Z | - |
dc.date.issued | 2017-11-02 | - |
dc.identifier.citation | APA 6th - Becerra Buitrago, A. y Umbarila Moncaleano, K. M. (2017) Evaluación técnico financiera del diseño del plan operacional de perforación radial para el pozo "A" del Campo Orito (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6453 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.11839/6453 | - |
dc.description | The present work is based on the design of the Operational Plan of Radial Drilling for Pit "A" of Campo Orito, where the problem of low productivity due to the pressure loss in the deposit is presented.It begins with the description of the generalities of the Caguan Putumayo Basin, as well as the production history of Campo Orito, continuing with a technical and theoretical description of the Radial Drilling. Next, a description of the generalities of Well "A" is made, where all the information concerning the well is presented in the Interest Formations, Caballos and Villeta, besides presenting the properties of the fluid of each of them, which was necessary to carry out the simulation of the production according to the proposed operational plan. Once the above was completed, the design of the Operational Plan for Radial Drilling for Well A was carried out, consisting of the drilling of 4 lateral holes at the same depth with a length of 300 feet each one. The intention of the operation is to increase the drainage radius of the well and consequently achieve a significant increase in production, in the case of the project, based on the result of the simulation carried out, an increase of 4 times the base production of the water well. | es_CO |
dc.description.abstract | El presente trabajo está basado en el diseño del plan operacional de Perforación Radial para el Pozo A del Campo Orito, en donde se presenta el problema de la baja productividad debido a la pérdida de presión en el yacimiento. Se inicia con la descripción de las generalidades de la Cuenca Caguán Putumayo, así como la historia de producción del Campo Orito, continuando con una descripción técnica y teórica de la Perforación Radial. A continuación, se realiza una descripción de las generalidades del Pozo A, en donde se presenta toda la información concerniente al pozo en las Formaciones de interés, Caballos y Villeta, además de presentar las propiedades del fluido de cada una de ellas, lo cual fue necesario para llevar a cabo la simulación de la producción de acuerdo al plan operacional propuesto. Una vez completado lo anterior, se procedió a realizar el diseño del Plan Operacional de Perforación Radial para el Pozo A, el cual consta de la perforación de 4 orificios laterales a una misma profundidad con una longitud de 300 pies cada uno. La intención de la operación es aumentar el radio de drenaje del pozo y por consiguiente lograr un aumento significativo en la producción, en el caso del proyecto, basados en el resultado de la simulación realizada, se obtuvo un incremento de 4 veces la producción base del pozo. | es_CO |
dc.description.sponsorship | Fluidos y Servicios S.A.S. | es_CO |
dc.language.iso | es | es_CO |
dc.publisher | Fundación Universidad de América | es_CO |
dc.rights | Atribución – No comercial – Compartir igual | es_CO |
dc.subject | Perforación Radial | es_CO |
dc.subject | Cuenca Caguán-Putumayo | es_CO |
dc.subject | Estimulación de Pozos | es_CO |
dc.subject | Radial Drilling | es_CO |
dc.subject | Caguán Putumayo Basin | es_CO |
dc.subject | Well Stimulation | es_CO |
dc.subject | Tesis y disertaciones académicas | es_CO |
dc.title | Evaluación técnico financiera del diseño del plan operacional de perforación radial para el pozo "A" del Campo Orito | es_CO |
dc.type | bachelorThesis | es_CO |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5112779-2017-2-IP.pdf | 4.46 MB | Adobe PDF | View/Open |