Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6658
Title: | Evaluación técnico financiera de la implementación del cabezal tipo Drilling Time Optimization (DTO) en la reducción de tiempos operacionales para un pozo petrolero |
Authors: | Alba Diaz, Andres Garzon Monroy, Diego Fernando |
Thesis advisor: | Amariz, Jaime Fernando Contreras Garzón, Alejandro |
License type: | Atribución – No comercial |
Keywords: | Reducción tiempos;Perforación;Reduction of operational times;Drilling;Tesis y disertaciones académicas |
Issue Date: | 14-Feb-2018 |
Publisher: | Fundación Universidad de América |
Resumen: | El presente proyecto se elabora con el propósito de evaluar la factibilidad del cabezal de pozo tipo DTO “drilling time optimization / optimización del tiempo de perforación” para el pozo B respecto al pozo A (donde se implementó cabezal de pozo tipo convencional), como una nueva estrategia durante la perforación de pozos petroleros mediante el estudio técnico financiero correspondiente. En la primera etapa del proyecto se consulta y se obtiene toda la información pertinente acerca de las generalidades de los pozos anteriormente nombrados, los modelos de cabezales de pozo (tipo convencional y tipo DTO) y a su vez datos obtenidos por medio del monitoreo de la implementación de los cabezales, como, tiempos, operaciones, tiempos operacionales planos, costos pertinentes y toda aquella información que sea necesaria. El proyecto se estudia con base en los análisis de los resultados técnico financiero de los pozos A (cabezal de pozo tipo convencional) y B (cabezal de pozo tipo DTO). Con este proyecto se evalúa la viabilidad del cabezal de pozo tipo DTO y, por consiguiente, establecer una decisión sobre la futura implementación de este. Finalmente, se realiza la evaluación de la viabilidad financiera del proyecto por medio de la metodología del indicador financiero Valor Presente Neto (VPN), que permite analizar la variabilidad en los costos de inversión asociados a los pozos A (cabezal de pozo tipo convencional) y B (cabezal de pozo tipo DTO). |
Abstract: | The present project is elaborated with the purpose of evaluating the feasibility of the DTO type well "Optimization of the drilling time / optimization of the drilling time" for the well B with respect to the well A (where the conventional wellhead is implemented), as a new strategy for the drilling of oil wells by the corresponding financial technical study. In the first stage of the project, all the information about the generalities of the wells previously mentioned, the models of well heads and heads, such as, times, operations, flat operational times, adequate costs and all that information that is necessary. The project is studied based on the analysis of the financial technical results of wells A (conventional type wellhead) and B (wellhead type DTO). With this project the viability of the DTO type well is evaluated and, consequently, a decision on the future implementation of this well is evaluated. Finally, the evaluation of the financial viability of the project is carried out using the financial indicator Net Present Value (NPV) methodology, which allows analyzing the variability in investment costs associated with wells A (conventional type wellhead) and B (wellhead type DTO). |
URI: | http://hdl.handle.net/20.500.11839/6658 |
Citation: | APA 6th - Alba Diaz, A. y Garzon Monroy, D. F. (2018) Evaluación técnico financiera de la implementación del cabezal tipo Drilling Time Optimization (DTO) en la reducción de tiempos operacionales para un pozo petrolero (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6658 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5131629-2018-1-IP.pdf | 7.03 MB | Adobe PDF | View/Open |