Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6663
Title: | Elaboración de un plan de trabajo para el procedimiento de movilización del RIG 50, en el área de Barrancabermeja en el campo la Cira-Infantas |
Authors: | Barrero Camacho, Juan Sebastián Monterrosa Molina, Juan Sebastián |
Thesis advisor: | Gómez Duque, Carlos Andres Escaño Suárez, Nadim Elías |
License type: | Atribución – No comercial |
Keywords: | Perforación;Taladro Electrico;Movilización Taladro;Drilling;Electric Rig;Rig Mobilization;Tesis y disertaciones académicas |
Issue Date: | 28-Feb-2018 |
Publisher: | Fundación Universidad de América |
Resumen: | Para el desarrollo de este trabajo, es necesario identificar y conocer los procesos, etapas y tareas que deben ejecutarse en todas las movilizaciones, iniciando por la realización del plan de movilización y finalizando con el alistamiento operativo de los equipos. Conocer dichas actividades es fundamental para realizar el análisis de las movilizaciones desarrolladas por el Rig 50 en el Campo La Cira - Infantas, donde se logran clasificar las desviaciones y los factores que afectan de manera significativa las horas de movilización del mismo, aumentando los costos operacionales y reduciendo la eficiencia del proceso. Posteriormente se procedió a presenciar una movilización, para observar las oportunidades de mejora que puedan traer consigo una reducción en los costos operacionales, dados principalmente por la reducción en las horas de ejecución del proceso. Es aquí donde por medio del análisis de los tiempos que toma realizar cada etapa de la actividad y en conjunto con el Software Project Managment, se logra evidenciar actividades que demandan un uso de recursos elevados en conjunto con altos tiempos para finalizarse. |
Abstract: | To the develop of this work, its necessary to identify and recognize the process, steps and stages that should be done in all mobilizations, beginning for the mobilization plan and finalizing with the operative of the equipment. The knowledge of those activities it’s a fundamental part to do the analysis of the historic mobilizations of the Rig 50 in Campo La Cira – Infantas, where deviations that make a long time and expensive mobilization can be classify. Later, being in a mobilization, key opportunities has been seen, this key opportunities pretend improve the mobilization times and decrease the hazards and the costs that are involved at the move of the Rig 50. It's here where the meticulous analysis and the project management software helps to demonstrate activities that demand a high use of resources together with high operative times. Part of this high times were being given by the return and suction tanks. As a method of solution to these delays, an alternative was proposed, which was the mud tanks of the Rig 50 would be replaced by ones with Fast Move characteristics. |
URI: | http://hdl.handle.net/20.500.11839/6663 |
Citation: | APA 6th - Barrero Camacho, J. S. y Monterrosa Molina, J. S. (2018) Elaboración de un plan de trabajo para el procedimiento de movilización del RIG 50, en el área de Barrancabermeja en el campo la Cira-Infantas (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6663 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5131621-2018-1-IP.pdf | 10.05 MB | Adobe PDF | View/Open |