Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/6668
Title: | Evaluación técnico-financiera de la sarta de varilla hueca implementada para el sistema de levantamiento de bombeo de cavidades progresivas en el pozo-a del campo Yaguará |
Authors: | Castillo Vargas, Ivan Camilo |
Thesis advisor: | Valderrama Cerón, Jasmine Espinosa Mora, Carlos Alberto |
License type: | Atribución – No comercial |
Keywords: | Levantamiento artificial;Varilla Hueca;Bombeo de cavidades progresivas;Artificial lift;Hollow Rod;Progressive cavity pump;Tesis y disertaciones académicas |
Issue Date: | 2-Mar-2018 |
Publisher: | Fundación Universidad de América |
Resumen: | El presente trabajo evalúa la implementación de una sarta con varilla hueca para el sistema de bombeo de cavidades progresivas (PCP) en un pozo con elevada tortuosidad, dog legs mayores a 4º/100 ft, y alta desviación, ángulos mayores a 50º, en el Campo Yaguará, donde las varillas convencionales y continuas fallaron en un tiempo menor a 75 días de operación. En primer lugar, se describen las generalidades y geología del Campo Yaguará, donde se encuentra el pozo objeto de estudio, con el fin de ubicar al lector en el escenario de la implementación; seguido de una descripción del sistema de levantamiento de bombeo de cavidades progresivas que entregó las herramientas necesarias para el desarrollo del análisis de fallas y de la respectiva simulación. Además, debido a las fallas recurrentes en el Pozo A, fue de vital importancia analizar cada una de las condiciones que llevaron a las distintas sartas de varillas implementadas a fallar en un corto periodo de tiempo, complementando con evidencias reales encontradas en las operaciones de servicio a pozo; para al final presentar la respectiva clasificación de las fallas mediante la metodología RIFT, aceptada en la industria Oil & Gas. |
Abstract: | This Job evaluates the implementation of the hollow rod in progressive cavity pumping system (PCP), in a well with high tortuosity, dog leg severity up to 4º/100 ft, deviation angles of 50º in Yaguara Field, where sucker and continuous rods failed in a brief period of time. First of all, the geology of Yaguara Field is described, where well A is located, with the purpose of established the reader in the implementation scenery. Secondly, the PCP system is explained with high detail to proceed with the respective failure analysis and the numerical simulation. Besides, due to the high frequency of the failures in well A, it was mandatory analyze each condition that led to the rod string to fail, complementing with real evidences found in the pulling operations; summarizing with the respective failures classification following the RIFT methodology, accepted in oil and gas industry. Additionally, numerical simulations was carried out to each of the differents rods evaluated (Sucker, Continuous and Hollow) with the software PC-Pump, property of C-Fer technologies. |
URI: | http://hdl.handle.net/20.500.11839/6668 |
Citation: | APA 6th - Castillo Vargas, I. C. (2018) Evaluación técnico-financiera de la sarta de varilla hueca implementada para el sistema de levantamiento de bombeo de cavidades progresivas en el pozo-a del campo Yaguará (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6668 |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5131647-2018-1-IP.pdf | 5.56 MB | Adobe PDF | View/Open |