Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/6812
Title: Evaluación técnica y financiera de la implementación de un sistema de Bombeo Mecánico con Unidad Hidráulica Offshore en el Pozo 13 del Campo Trintes
Other Titles: Financial and technical evaluation of the Offshore Mechanical Hydraulic Pumping Unit implementation in the Well 13 on Trintes Field
Authors: Flórez Sánchez, Alejandro
Uscategui Rodríguez, Jairo Armando
Thesis advisor: Ladrón De Guevara Rangel, Alejandro
Rubio Arvilla, Claudia Angélica
License type: Atribución – No comercial
Keywords: Offshore;UHBM;Producción;Tesis y disertaciones académicas
Issue Date: 10-Aug-2018
Publisher: Fundación Universidad de América
Resumen: El desarrollo del presente proyecto se realizará definiendo las generalidades del Campo Trintes donde se encuentra ubicado el Pozo 13, se describirán los aspectos geológicos más relevantes del Campo, así como, de los sistemas de levantamiento artificial utilizados antes y durante el proyecto. Por otro lado, se describirán los principales parámetros de operación de dichos equipos y sus problemas más frecuentes. El método de validación técnica se realizará mediante una matriz comparativa entre el sistema de Bombeo Electro-Sumergible, y la Unidad Hidráulica de Bombeo Mecánico Offshore donde se definirán los factores más importantes de la operación con cada equipo y se determinará la mejor opción. Finalmente, se determinará una viabilidad financiera de la puesta en funcionamiento de la Unidad Hidráulica definiendo los ingresos generados por el proyecto, así como, sus costos tanto de capital (CAPEX) como de operación (OPEX) y mediante un flujo de caja se calcularán los indicadores de Valor Presente Neto (VPN) y la Tasa Interna de Retorno (TIR).
Abstract: The development of these proyect will be done of defining the main generalities of Trintes Field, where, is located the Well 13, it will describe the most important geological topics of the Field, as well as, the artificial lifts used then and now. On the other hand, there will be described the principal parameters of operation of the above mentioned equipments and his most frequent problems. The technical validation method will be through a comparative matrix between the Electrical Submersible Pump system, and the Offshore Mechanical Hydraulic Pumping Unit, where, it will be defined the main operational factors for each equipment and then determine the best option. Finally, it will be calculate the financial viability of the implementation of the Offshore Mechanical Hydraulic Pumping Unit defining the generated earnings for the project, as well as, the capital expenditures (CAPEX) and also the operative expenditures (OPEX) and then through a cash flow calculate the Net Present Value (NPV) and the Internal Rate of Return (IRR).
URI: http://hdl.handle.net/20.500.11839/6812
Citation: APA 6th - Flórez Sánchez, A. y Uscategui Rodríguez, J. A. (2018) Evaluación técnica y financiera de la implementación de un sistema de Bombeo Mecánico con Unidad Hidráulica Offshore en el Pozo 13 del Campo Trintes (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/6812
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5132755-2018-2-IP.pdf6.7 MBAdobe PDFView/Open


This item is licensed under a Creative Commons Licence Creative Commons