Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/8207
Title: Evaluación del desempeño del sistema de zaranda modular doble deck en el pozo Liria YW-12 para su implementación en el Campo Liria.
Other Titles: Performance evaluation of a double deck modular shaker system in the Liria YW-12 well for it's implementation in the Liria field
Authors: Ibáñez Ortiz, Juan Sebastián
Mariño Colmenares, Luis Felipe
Thesis advisor: Colmenares, Edilberto
Gómez Alba, Sebastián Alejandro
License type: Atribución – No comercial
Keywords: Control sólidos primario;Fluidos de perforación;Primary solids control;Drilling fluids;Tesis y disertaciones académicas
Issue Date: 3-Nov-2020
Publisher: Fundación Universidad de América
Resumen: En el presente trabajo de grado se realizó una evaluación del desempeño de la zaranda modular doble deck en el pozo Liria YW-12 del campo Liria ubicado dentro del Bloque Recetor en comparación a una zaranda convencional en un pozo Offset ubicado en la cercanía del pozo Liria YW-12. Para realizar la evaluación de desempeño, se estudiaron la generalidades y características de las zarandas, las propiedades del fluido de perforación y las mallas utilizadas. Para el análisis del desempeño de las zarandas usadas en la perforación de los pozos se llevaron a cabo cinco pruebas de campo: 1. Retención de los fluidos en los recortes (ROC), 2. Capacidad de procesamiento, 3. Porcentaje de solidos de baja gravedad y alta gravedad, 4. Costos de mallas y 5. Vida útil de mallas (screen life). Se compararon ambas zarandas de acuerdo con los resultados obtenidos durante las pruebas en las secciones denominadas A1-B1 en el pozo Liria YW-12 y A2-B2 en el pozo Offset.
Abstract: In this undergraduate work, an evaluation of the performance of the double deck modular shaker was made in the Liria YW-12 well in the Liria field, located in the Recetor block, in comparison to a conventional shaker in an offset well located nearby the Liria YW-12 well. In order to do the performance evaluation, the shaker’s generalities and characteristics were described along with the properties of the drilling fluid and the meshes used during the drilling. For the analysis of the performance of the shakers used in the drilling of the wells, five field tests were made, retention of fluids in cuttings (ROC), processing capacity, percentage of low and high gravity solids, screen life and cost of these. In order to technically compare both shakers according to the results obtained during the tests, in the sections named A1-B1 in the Liria YW-12 well and A2-B2 in the Offset well.
URI: https://hdl.handle.net/20.500.11839/8207
Citation: APA 7th - Ibáñez Ortiz, J. S. y Mariño Colmenares, L. F. (2020) Evaluación del desempeño del sistema de zaranda modular doble deck en el pozo Liria YW-12 para su implementación en el Campo Liria. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8207
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5151131-2020-2-IP.pdf2 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
172.6 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons