Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/935
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.advisor | López Uribe, Juan Enrique | - |
dc.contributor.advisor | Amariz Ortiz, Jaime Fernando | - |
dc.contributor.author | Cortés Gutiérrez, Michel | - |
dc.contributor.author | Medina Sarmiento, Angélica María | - |
dc.date.accessioned | 2017-04-25T14:16:13Z | - |
dc.date.available | 2017-04-25T14:16:13Z | - |
dc.date.issued | 2017-03-18 | - |
dc.identifier.citation | APA 6th - Cortés Gutiérrez, M. y Medina Sarmiento, A. M. (2017) Evaluación técnico-financiera para el diseño de una línea de transferencia de fluidos producidos desde la estación Toro sentado al cluster bengala en el bloque Caracara (Trabajo de grado). Fundación Universidad de América. Retrieved from http://hdl.handle.net/20.500.11839/935 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.11839/935 | - |
dc.description | In this project the technical-financial evaluation for the design is made a transfer line of the Sitting Station Toro to the Bengal Cluster, in order to take advantage of the existing transfer lines between the Bengal Cluster and the Jaguar Station, guaranteeing a transport of fluids Continuous, with lower risks associated with field operations, and resulting in greater profitability to the company compared to the existing system of production of car tank tanks used. | es_CO |
dc.description.abstract | En este proyecto se hace la evaluación técnico-financiera para el diseño una línea de transferencia de la Estación Toro Sentado al Clúster Bengala, con la finalidad de aprovechar las líneas existentes de transferencia entre el Clúster Bengala y la Estación Jaguar, garantizando un transporte de fluidos continuo, con menores riesgos asociados a las operaciones de campo, y redundando en mayor rentabilidad a la compañía en comparación del sistema existente de producción de por carro-tanques utilizados. | es_CO |
dc.description.sponsorship | Cespa Colombia S.A. | es_CO |
dc.language.iso | es | es_CO |
dc.publisher | Fundación Universidad de América | es_CO |
dc.rights | Atribución – No comercial | es_CO |
dc.subject | Fluidos | es_CO |
dc.subject | Fluido estructura | es_CO |
dc.subject | Linea de trasferencia | es_CO |
dc.subject | Fluids | es_CO |
dc.subject | Fluid structure | es_CO |
dc.subject | Transfer line | es_CO |
dc.subject | Tesis y disertaciones académicas | es_CO |
dc.title | Evaluación técnico-financiera para el diseño de una línea de transferencia de fluidos producidos desde la estación Toro sentado al cluster bengala en el bloque Caracara | es_CO |
dc.type | bachelorThesis | es_CO |
Appears in Collections: | Trabajos de grado - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5112769-2017-1 IP.pdf | 9 MB | Adobe PDF | View/Open |