Arquitectura
Economía
Ciencias y humanidades
Ingenierías

Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/20.500.11839/9394
Título: Implementación de la metodología de análisis de causa raíz (ACR) para la reducción del índice de fallas en la sarta de varilla de los pozos con bombeo de cavidad progresiva en Campo La Cira-Infantas de la Cuenca del Valle Medio del Magdalena
Otros títulos: Implementation of the root cause analysis (rca) methodology for the reduction of the failure rate in the rod string wells with progressive cavity pumping in Campo La Cira-Infantas of the Middle Magdalena Valley Basin
Autor(es): Molinares Abaunza, Gabriel Augusto
Torres González, Nohora Carolina
Docente Investigador: Jiménez Bracho, Edinson Enrique
Tipo de licencia: Atribución – No comercial – Compartir igual
Palabras clave: Análisis causa raíz;Bombeo cavidad progresiva;Índice falla;Root cause analysis;Progressive cavity pumping;Index fails;Tesis y disertaciones académicas
Fecha de publicación: 22-ene-2024
Editorial: Fundación Universidad de América
Resumen: El presente trabajo de grado tuvo como objetivo fundamental el análisis de las fallas en la sarta de varillas en los pozos con bombeo de cavidades progresivas en el Campo La Cira Infantas en la Cuenca del Valle Medio del Magdalena mediante la aplicación de la metodología de Análisis de Causa Raíz (ACR), la cual ha demostrado ser muy útil en la identificación de fallas recurrentes. La metodología de trabajo se enmarcó en la selección de los pozos con fallas críticas por varilla en los sistemas con bombeo por cavidades progresivas en los últimos años, 2019 – 2023. Para ello, se establecieron dos (2) criterios de selección, los pozos con tiempo de duración o run life menor o igual a 150 días y los pozos con alto potencial de producción de crudo con valores superiores a los 20 BOPD, lo que permitió la selección de los pozos LCIG&C-1, LCIG&C-8 y LCIG&C-20 para aplicar la metodología de ACR.
Abstract: The fundamental objective of this degree work was the analysis of failures in the rod string in wells with progressive cavity pumping in the La Cira Infantas Field in the Middle Magdalena Valley Basin through the application of the Analysis methodology. Root Cause (ACR), which has proven to be very useful in identifying recurring failures. The work methodology was framed in the selection of wells with critical rod failures in systems with progressive cavity pumping in recent years, 2019 - 2023. For this, two (2) selection criteria were established, wells with duration time or run life less than or equal to 150 days and wells with high crude oil production potential with values ​​greater than 20 BOPD, which allowed the selection of wells LCIG&C-1, LCIG&C-8 and LCIG&C-20 for apply the ACR methodology.
URI: https://hdl.handle.net/20.500.11839/9394
Citación: APA 7th - Molinares Abaunza, G. A. y Torres González, N. C. (2024) Implementación de la metodología de análisis de causa raíz (ACR) para la reducción del índice de fallas en la sarta de varilla de los pozos con bombeo de cavidad progresiva en Campo La Cira-Infantas de la Cuenca del Valle Medio del Magdalena. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9394
línea de énfasis: Investigación
Aparece en las colecciones:Trabajos de grado - Ingeniería de Petróleos

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
5211115-2024-1-IP.pdf1.86 MBAdobe PDFVisualizar/Abrir
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Accesso Restringido
835.06 kBAdobe PDFVisualizar/Abrir    Request a copy


Este ítem está sujeto a una licencia Creative Commons Creative Commons