Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/9394
Title: Implementación de la metodología de análisis de causa raíz (ACR) para la reducción del índice de fallas en la sarta de varilla de los pozos con bombeo de cavidad progresiva en Campo La Cira-Infantas de la Cuenca del Valle Medio del Magdalena
Other Titles: Implementation of the root cause analysis (rca) methodology for the reduction of the failure rate in the rod string wells with progressive cavity pumping in Campo La Cira-Infantas of the Middle Magdalena Valley Basin
Authors: Molinares Abaunza, Gabriel Augusto
Torres González, Nohora Carolina
metadata.dc.contributor.advisordocenteinvestigador: Jiménez Bracho, Edinson Enrique
License type: Atribución – No comercial – Compartir igual
Keywords: Análisis causa raíz;Bombeo cavidad progresiva;Índice falla;Root cause analysis;Progressive cavity pumping;Index fails;Tesis y disertaciones académicas
Issue Date: 22-Jan-2024
Publisher: Fundación Universidad de América
Resumen: El presente trabajo de grado tuvo como objetivo fundamental el análisis de las fallas en la sarta de varillas en los pozos con bombeo de cavidades progresivas en el Campo La Cira Infantas en la Cuenca del Valle Medio del Magdalena mediante la aplicación de la metodología de Análisis de Causa Raíz (ACR), la cual ha demostrado ser muy útil en la identificación de fallas recurrentes. La metodología de trabajo se enmarcó en la selección de los pozos con fallas críticas por varilla en los sistemas con bombeo por cavidades progresivas en los últimos años, 2019 – 2023. Para ello, se establecieron dos (2) criterios de selección, los pozos con tiempo de duración o run life menor o igual a 150 días y los pozos con alto potencial de producción de crudo con valores superiores a los 20 BOPD, lo que permitió la selección de los pozos LCIG&C-1, LCIG&C-8 y LCIG&C-20 para aplicar la metodología de ACR.
Abstract: The fundamental objective of this degree work was the analysis of failures in the rod string in wells with progressive cavity pumping in the La Cira Infantas Field in the Middle Magdalena Valley Basin through the application of the Analysis methodology. Root Cause (ACR), which has proven to be very useful in identifying recurring failures. The work methodology was framed in the selection of wells with critical rod failures in systems with progressive cavity pumping in recent years, 2019 - 2023. For this, two (2) selection criteria were established, wells with duration time or run life less than or equal to 150 days and wells with high crude oil production potential with values ​​greater than 20 BOPD, which allowed the selection of wells LCIG&C-1, LCIG&C-8 and LCIG&C-20 for apply the ACR methodology.
URI: https://hdl.handle.net/20.500.11839/9394
Citation: APA 7th - Molinares Abaunza, G. A. y Torres González, N. C. (2024) Implementación de la metodología de análisis de causa raíz (ACR) para la reducción del índice de fallas en la sarta de varilla de los pozos con bombeo de cavidad progresiva en Campo La Cira-Infantas de la Cuenca del Valle Medio del Magdalena. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9394
metadata.dc.publisher.program: Investigación
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5211115-2024-1-IP.pdf1.86 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
835.06 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons