Title: Evaluación de la reutilización de cable de potencia de bombas electrosumergibles en pozos del Campo CPO-09
Other Titles: Evaluation of the reuse of power cable of electrosumergible pumps in wells of Field CPO-09
Authors: Useche Alarcón, Camila Andrea
Zapata Sierra, Daniel Sebastián
Thesis advisor: Díaz Camacho, Alberto
License type: Atribución – No comercial
Keywords: Bombeo electrosumergible;Cable potencia;Capilar;Producción;Electro submergible pump;Power cable;Capillary tubing;Production;Tesis y disertaciones académicas
Issue Date: 20-May-2020
Publisher: Fundación Universidad de América
Resumen: En este trabajo de grado se evalúa la reutilización de cable de potencia de bombas electrosumergibles, mediante un proceso de inspección tanto mecánica como eléctrica, el cual asegura un estado óptimo para operación en subsuelo siguiendo los lineamientos de las normas IEEE 1019, ASTM A459 y ASTM B33, las cuales garantizan el buen funcionamiento del cable de potencia dentro del sistema de levantamiento de bombeo electrosumergible. A partir del procedimiento de inspección se desarrolló un programa de Excel programado bajo el lenguaje de Visual Basic, en el cual se identifican las diferentes características del cable, las cuales permiten facilitar la selección del cable a utilizar en una nueva intervención a pozo.
Abstract: On this thesis degree, the reuse and repurpose of the electro submergible pump power cable is being evaluated throughout an inspection process both mechanical and electrical that have been used on this industry to assure the optimal state for operations on the subsoil following the guidelines of the policy IEEE 1019, ASTM A459 and ASTM B33, that guarantee the proper functioning of the power cable within the electro submergible pump lift system. As an output of the inspection procedure, an Excel program was developed under the Visual Basic language which helps to identify the different characteristics of the cable and therefore assuring an accurate selection of the cable to use when intervening the well again.
URI: https://hdl.handle.net/20.500.11839/7964
Citation: APA 7th - Useche Alarcón, C. A. y Zapata Sierra, D. S. (2020) Evaluación de la reutilización de cable de potencia de bombas electrosumergibles en pozos del Campo CPO-09 [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/7964
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5142080-2020-1-IP.pdf1.97 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
342.62 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons