Architecture
Economic and administrative sciences
Sciences and Humanities
Engineering

Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11839/8274
Title: Optimización en la planeación de pozos por medio de la predicción de tiempos, costos y NPT´S, aplicando un modelo de machine learning para la campaña de perforación de Castilla y Castilla norte 2020
Other Titles: Optimization in well planning through the prediction of times, costs and NPT'S, applying a machine learning model for the 2020 Castilla and Castilla norte drilling campaign
Authors: Martínez Alonso, Juan David
Poveda Cruz, Johan Steven
Thesis advisor: Fernández Barrero, Nelson
License type: Atribución – No comercial – Sin Derivar
Keywords: Matriz complejidad;Método supervisado;Predicción de tiempos;Complexity matrix;Supervised method;Time prediction;Tesis y disertaciones académicas
Issue Date: 15-Feb-2021
Publisher: Fundación Universidad de América
Resumen: Actualmente la compañía Ecopetrol S.A, tiene en cuenta los datos técnicos-históricos tales como los que se encuentran almacenados en OpenWells y Power BI, para evaluar el desempeño durante la fase de perforación de los pozos semana a semana, en vez de aprovechar dicha información junto con las variables implicadas en la matriz de complejidad, para optimizar la planeación de pozos mediante la implementación de un modelo predictivo generando así un valor agregado sobre la información almacenada. Considerando lo anterior, el presente trabajo de grado se realizó con el fin de optimizar la planeación de pozos para la campaña de perforación de Castilla y Castilla Norte 2020 al aplicar los modelos de machine Learning seleccionados, los cuales predicen días costos y NPT’s asociados a problemas en hueco abierto.
Abstract: Currently the company Ecopetrol SA, takes into account the technical-historical data such as those stored in OpenWells and Power BI, to evaluate the performance during the drilling phase of the wells week by week, instead of taking advantage of this information together with the variables involved in the complexity matrix, to optimize well planning through the implementation of a predictive model, thus generating added value on the stored information. Considering the above, the present degree work was carried out in order to optimize well planning for the 2020 Castilla y Castilla Norte drilling campaign by applying the selected machine Learning models, which predict cost days and NPT's associated with problems in open hole. Therefore, a methodology aimed at the implementation of three supervised machine learning models was designed, based on the information from the 2019 Castilla y Castilla Norte drilling campaign. Subsequently, the prediction of the models was implemented and evaluated. for the same field in 2020.
URI: https://hdl.handle.net/20.500.11839/8274
Citation: APA 7th - Martínez Alonso, J. D. y Poveda Cruz, J. S. (2021) Optimización en la planeación de pozos por medio de la predicción de tiempos, costos y NPT´S, aplicando un modelo de machine learning para la campaña de perforación de Castilla y Castilla norte 2020. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8274
Appears in Collections:Trabajos de grado - Ingeniería de Petróleos

Files in This Item:
File Description SizeFormat 
5152276-2021-1-IP.pdf2.45 MBAdobe PDFView/Open
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Access Restricted
183.68 kBAdobe PDFView/Open    Request a copy


This item is licensed under a Creative Commons Licence Creative Commons