Título: Estudio de implementación de paneles solares para la captación de energía solar en el suministro de energía para un cargadero de carrotanques en la transferencia de hidrocarburos.
Otros títulos: Study of the implementation of solar panels for the capture of solar energy in the supply of energy for a loader for tank cars in the transfer of hydrocarbons.
Autor(es): Bernal Barragán, Diego Alejandro
Latorre Cabra, Álvaro Alejandro
Ríos Torres, Juan Felipe
Director de tesis: Gómez Vargas, Julián Andrés
Tipo de licencia: Atribución – No comercial
Palabras clave: Energía solar;Hidrocarburos;Sostenibilidad;Solar energy;Hydrocarbons;Sustainability;Tesis y disertaciones académicas
Fecha de publicación: 23-feb-2022
Editorial: Fundación Universidad de América
Resumen: En el presento trabajo se realizó el análisis de viabilidad de instalar paneles solares para el suministro de energía para los equipos de un sistema de cargadero de carrotanque. Para realizar este análisis de viabilidad, primero fue necesario determinar en qué sector de Colombia se presenta mayor radiación solar. Posteriormente se determina cual es la potencia eléctrica requerida por los equipos y de esta forma definir la cantidad de paneles solares, esto nos permite saber la viabilidad técnica. Para finalizar el proyecto se hacer el respectivo análisis financiero donde se tiene en cuenta todos los costos de un sistema de cargue de carrotanque sin usar los paneles solares y utilizando esa energía renovable para comparar los valores y poder concluir su viabilidad.
Abstract: In the present work, the feasibility analysis of installing solar panels for the supply of energy for the equipment of a tank car loading system was carried out. To carry out this feasibility analysis, it was first necessary to determine in which sector of Colombia the highest solar radiation occurs. Subsequently, the electrical power required by the equipment is determined and in this way define the number of solar panels, this allows us to know the technical feasibility. To finalize the project, the respective financial analysis will be carried out where all the costs of a tank car loading system without using solar panels and using that renewable energy are taken into account to compare the values ​​and be able to conclude its viability.
URI: https://hdl.handle.net/20.500.11839/8896
Citación: APA 7th - Bernal Barragán, D. A., Latorre Cabra, Á. A. y Ríos Torres, J. F. (2022) Estudio de implementación de paneles solares para la captación de energía solar en el suministro de energía para un cargadero de carrotanques en la transferencia de hidrocarburos. [Trabajo de grado, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/8896
Aparece en las colecciones:Trabajos de grado - Gerencia de Proyectos

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
556526-2022-1-GP.pdf617.43 kBAdobe PDFVisualizar/Abrir
CARTA DE CESIÓN DE DERECHOS Y AUTORIZACIÓN PARA PUBLICACIÓN.pdf
Accesso Restringido
471.34 kBAdobe PDFVisualizar/Abrir    Request a copy


Este ítem está sujeto a una licencia Creative Commons Creative Commons