Architecture
Economic and administrative sciences
- Economy
- Business Administration
- Statistics and Actuarial Sciences
- International Business
- Project Management Specialization
- Business Management Specialization
- ???jsp.home.menu-lumieres.ehuman???
- Occupational Health and Safety Management Specialization
- International Business and Economic Integration Specialization
- Master MBA Administration
- Master Degree in Human Talent Management
Sciences and Humanities
Engineering
- Industrial engineering
- Mechanical Engineering
- Petroleum engineering
- Chemical engineering
- Environmental engineering
- Energy Engineering
- Mechatronics Engineering
- Quality Management Specialization
- Environmental Management Specialization
- Master in Environmental Management for Competitiveness
- Master Degree in Comprehensive Quality and Productivity Management
- Reservoir Engineering Master
- Master in Advanced Hydrocarbon Recovery
Please use this identifier to cite or link to this item:
https://hdl.handle.net/20.500.11839/9293
Title: | Evaluación de la configuración de la sección B de diámetro 11” de un wellhead en pozos revestidos con liner hanger de 7" para uso de tubing hanger 7 1/16” en la Empresa Gran Tierra Energy Colombia, LLC Sucursal. |
Other Titles: | Evaluation of the configuration of section B of 11" diameter of a wellhead in wells lined with 7" liner hanger for use of 7 1/16" tubing hanger in the company Gran Tierra Energy Colombia, LLC Branch |
Authors: | González Manrique, Kimberly |
metadata.dc.contributor.advisordocentenoinv: | Paz Aranguren, Arnul David |
metadata.dc.contributor.advisordocenteexterno: | González, Ignacio Aldemar |
License type: | Atribución| |
Keywords: | Evaluación de configuración;Pozos revestidos;Workover;Configuration evaluation;Lined wells;Workover |
Issue Date: | 14-Aug-2023 |
Publisher: | Fundación Universidad de América |
Resumen: | Este proyecto se enfoca en la evaluación de la configuración de la sección B de 11" de diámetro de un WellHead en pozos revestidos con un Liner Hanger de 7" para el uso de un Tubing Hanger de 7 1/16" en Gran Tierra Energy Colombia, LLC. El objetivo principal es optimizar los tiempos y costos en el área de trabajo mediante la identificación de la mejor opción de diseño para la instalación de un Blowout Preventer (BOP) de 7 1/16” y así usar un Tubing Hanger de 7 1/16", siendo un dispositivo crucial en las operaciones de workover. El workover se refiere a la intervención realizada en un pozo de petróleo o gas existente para mejorar o mantener su producción. Durante el workover, se utilizan equipos y herramientas para acceder al pozo y realizar diversas actividades, como la limpieza, reparación o reacondicionamiento de la zona de producción. Durante estas operaciones, es esencial contar con un sistema de control de presión confiable, y ahí es donde entra en juego la BOP. |
Abstract: | This project focuses on the evaluation of the configuration of the 11" diameter B section of a WellHead in wells cased with a 7" Liner Hanger for the use of a 7 1/16" Tubing Hanger at Gran Tierra Energy Colombia , LLC. The main objective is to optimize times and costs in the work area by identifying the best design option for the installation of a 7 1/16” Blowout Preventer (BOP) and thus use a 7 1/16” Tubing Hanger 1/16", being a crucial device in workover operations. Workover refers to the intervention carried out on an existing oil or gas well to improve or maintain its production. During workover, equipment and tools are used to access the well and perform various activities, such as cleaning, repairing or reconditioning the production area. During these operations, it is essential to have a reliable pressure control system, and that is where the BOP comes into play. |
URI: | https://hdl.handle.net/20.500.11839/9293 |
Citation: | APA 7th - González Manrique, K. (2023) Evaluación de la configuración de la sección B de diámetro 11” de un wellhead en pozos revestidos con liner hanger de 7" para uso de tubing hanger 7 1/16” en la Empresa Gran Tierra Energy Colombia, LLC Sucursal. [Informe de pasantía, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9293 |
metadata.dc.publisher.program: | Revestimiento de pozos |
Appears in Collections: | Informes de Pasantía - Ingeniería de Petróleos |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
5211135-2023-2-IP.pdf Access Restricted | 1.77 MB | Adobe PDF | View/Open Request a copy |