Título: Evaluación de la configuración de la sección B de diámetro 11” de un wellhead en pozos revestidos con liner hanger de 7" para uso de tubing hanger 7 1/16” en la Empresa Gran Tierra Energy Colombia, LLC Sucursal.
Otros títulos: Evaluation of the configuration of section B of 11" diameter of a wellhead in wells lined with 7" liner hanger for use of 7 1/16" tubing hanger in the company Gran Tierra Energy Colombia, LLC Branch
Autor(es): González Manrique, Kimberly
Docente no Investigador: Paz Aranguren, Arnul David
Docente externo: González, Ignacio Aldemar
Tipo de licencia: Atribución|
Palabras clave: Evaluación de configuración;Pozos revestidos;Workover;Configuration evaluation;Lined wells;Workover
Fecha de publicación: 14-ago-2023
Editorial: Fundación Universidad de América
Resumen: Este proyecto se enfoca en la evaluación de la configuración de la sección B de 11" de diámetro de un WellHead en pozos revestidos con un Liner Hanger de 7" para el uso de un Tubing Hanger de 7 1/16" en Gran Tierra Energy Colombia, LLC. El objetivo principal es optimizar los tiempos y costos en el área de trabajo mediante la identificación de la mejor opción de diseño para la instalación de un Blowout Preventer (BOP) de 7 1/16” y así usar un Tubing Hanger de 7 1/16", siendo un dispositivo crucial en las operaciones de workover. El workover se refiere a la intervención realizada en un pozo de petróleo o gas existente para mejorar o mantener su producción. Durante el workover, se utilizan equipos y herramientas para acceder al pozo y realizar diversas actividades, como la limpieza, reparación o reacondicionamiento de la zona de producción. Durante estas operaciones, es esencial contar con un sistema de control de presión confiable, y ahí es donde entra en juego la BOP.
Abstract: This project focuses on the evaluation of the configuration of the 11" diameter B section of a WellHead in wells cased with a 7" Liner Hanger for the use of a 7 1/16" Tubing Hanger at Gran Tierra Energy Colombia , LLC. The main objective is to optimize times and costs in the work area by identifying the best design option for the installation of a 7 1/16” Blowout Preventer (BOP) and thus use a 7 1/16” Tubing Hanger 1/16", being a crucial device in workover operations. Workover refers to the intervention carried out on an existing oil or gas well to improve or maintain its production. During workover, equipment and tools are used to access the well and perform various activities, such as cleaning, repairing or reconditioning the production area. During these operations, it is essential to have a reliable pressure control system, and that is where the BOP comes into play.
URI: https://hdl.handle.net/20.500.11839/9293
Citación: APA 7th - González Manrique, K. (2023) Evaluación de la configuración de la sección B de diámetro 11” de un wellhead en pozos revestidos con liner hanger de 7" para uso de tubing hanger 7 1/16” en la Empresa Gran Tierra Energy Colombia, LLC Sucursal. [Informe de pasantía, Fundación Universidad de América] Repositorio Institucional Lumieres. https://hdl.handle.net/20.500.11839/9293
línea de énfasis: Revestimiento de pozos
Aparece en las colecciones:Informes de Pasantía - Ingeniería de Petróleos

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
5211135-2023-2-IP.pdf
Accesso Restringido
1.77 MBAdobe PDFVisualizar/Abrir    Request a copy


Este ítem está sujeto a una licencia Creative Commons Creative Commons